When NYCT overlay's CBTC signalling on a line the block wayside system is upgraded at the same time and the two systems work in tandem. This allows non-CBTC equipped trains to operate over CBTC controlled territory and the wayside system functions as a backup should CBTC fail for any reason.
As you point the integration work for this is complex and is usually the primary driver of delays and cost increases.
As you point the integration work for this is complex and is usually the primary driver of delays and cost increases.